Quick Answer
A Mercury UPS holds your equipment for 5 to 10 minutes at a true 100% load, and roughly 10 to 25 minutes at half load. Those minutes are the whole value. The changeover happens within milliseconds, so a properly sized UPS will normally keep your PC, decoder and CCTV system running without interruption while power settles or your generator starts.
Want hours rather than minutes? That is a different tool, and Mercury builds both. Pair the UPS with a Mercury inverter system with deep cycle batteries, or move up to an online UPS with an external battery cabinet. Mercury UPS units start at ₦42,000 for the Mercury UPS 650.
The large online range gives you a choice. The MP PRO single phase towers include their batteries, ready to deliver flicker-free protection to servers, imaging equipment and banking systems the moment you switch on. Envy battery architecture varies by model: the 2kVA includes internal batteries and can accept optional external modules, while the larger Envy and three phase units use external banks sized for the required runtime, which is how the same machine stretches from minutes to more than 12 hours. Jump to the big online UPS section for the numbers.
Every week somebody calls us surprised that their new UPS held for seven minutes. Sound familiar? Those seven minutes are doing more work than they look. The battery inside a desktop UPS is a small sealed lead-acid cell, usually 12V 8.2Ah or 12V 9Ah, kept compact so the unit stays affordable, wall-friendly and easy to service. Compare it to the 200Ah deep cycle battery in an inverter system: different chemistry, different job, different machine.
So the answer to how long does a Mercury UPS last is: long enough to save your file, park your CCTV recording, and shut the machine down properly, every single time NEPA blinks. For the hours after that, you add an inverter.
WHY A UPS IS BUILT FOR MINUTES, NOT HOURS
Three design choices set UPS runtime, and each one buys you something:
- The speed comes from the electronics, not the battery. A UPS switches quickly because its transfer circuitry and inverter are designed to respond within milliseconds. The Mercury UPS 850 Maverick, for example, lists a 12V 9Ah battery and a 2 to 6ms transfer time as two separate specifications. The internal battery is kept small to make the unit compact, affordable and easy to maintain. That small battery is why a desktop UPS delivers minutes rather than hours, not why it switches quickly.
- Heavy current draws down a small cell quickly. Pull 600W out of a 9Ah cell and you get closer to half of the 108Wh, not all of it. Engineers call this the Peukert effect. It is why runtime climbs sharply the moment you take load off, and why sizing one class above your actual draw pays for itself.
- The unit is tuned for switchover, and that is the hard part. Whether you choose a line interactive UPS or a true online double conversion UPS, the engineering goes into catching the cut cleanly, every time, for years. That is the part a generator cannot do and an inverter does more slowly.
MERCURY UPS RUNTIME BY MODEL (AUGUST 2026 PRICES)
Because almost nobody runs a UPS at 100% capacity, real-world runtime depends far more on the actual connected load than on the number printed on the box. The table below covers Mercury Direct’s most commonly purchased desktop UPS models and selected online units, using current August 2026 prices.
| Mercury Model | Capacity | Internal Battery | Full Load Runtime | Half Load Runtime | Price | Typical Use |
|---|---|---|---|---|---|---|
| Mercury UPS 650 | 650VA / 390W | 1 x 12V 8.2Ah | 5 to 8 minutes | 10 to 18 minutes | ₦42,000 | Router, ONT, decoder, or one small office PC |
| Mercury UPS 850 Maverick | 850VA / 510W | 1 x 12V 9Ah | 5 to 8 minutes | 12 to 20 minutes | ₦45,000 | Desktop plus monitor, single POS terminal |
| Mercury UPS 1050 | 1050VA / 630W | 1 x 12V 9Ah | 4 to 6 minutes | 10 to 15 minutes | ₦63,000 | Standard desktop, decoder, and Wi-Fi kit |
| Mercury UPS 1550VA Maverick | 1550VA / 930W | 2 x 12V 8.2Ah | 5 to 7 minutes | 14 to 22 minutes | ₦90,000 | Two workstations, or a small CCTV and NVR hub |
| Mercury Elite 2000VA Pro | 2000VA / 1200W | 2 x 12V 9Ah | 4 to 6 minutes | 12 to 18 minutes | ₦288,000 | Retail till systems, small comms cabinet |
| Mercury Elite 3000VA Pro | 3000VA (about 1800W) | 4 x 12V 9Ah | 5 to 7 minutes | 12 to 18 minutes | ₦325,000 | Office server cabinet, clinic equipment |
| Mercury 2kVA Online UPS Envy | 2000VA / 1800W | 4 x 12V 9Ah internal, plus optional external modules | 3 to 5 minutes | 10 to 15 minutes | ₦550,000 currently out of stock, confirm availability |
Server racks and sensitive equipment that cannot tolerate any transfer time |
These are realistic engineering estimates for new, fully charged batteries under normal operating conditions. Actual runtime varies with connected load, battery age, temperature and state of charge.
Note also that “half load” means half the wattage column, not half the VA. A Mercury UPS 1050 at half load is carrying about 315W, which in practice is a desktop, a monitor, a router, and a decoder. Push past that and you are back to single-digit minutes.
The Mercury Elite 3000VA Pro is a 3000VA line-interactive UPS with modified sine wave output and a brief transfer time. It is not the same product as the Mercury 3kVA Online UPS, which uses true online double conversion technology, pure sine wave output and zero transfer time. If your equipment specifically requires online double conversion, confirm the exact model before ordering because the two products are frequently confused. The Mercury UPS buying guide lists the full range side by side.
HOW TO CALCULATE MERCURY UPS RUNTIME YOURSELF
Do not take anybody’s word for it, including ours. Work it out. The formula is the same one used for inverter sizing, just with much smaller numbers:
For a UPS, “usable fraction” is where people go wrong. A deep cycle inverter battery gives you about 80% of its rating. A small sealed UPS battery being drained hard gives you far less, roughly 50% at full load and around 65% to 70% at light load. Inverter efficiency sits at about 85%.
Worked example: Mercury UPS 1050 carrying a 300W desktop
- Battery energy: 12V x 9Ah = 108 watt-hours
- Usable at this discharge rate: 108 x 0.65 = 70 watt-hours
- After inverter losses: 70 x 0.85 = 59.5 watt-hours
- Runtime: 59.5 ÷ 300 = 0.198 hours, which is about 12 minutes
Now run the same unit at its full 630W rating and the usable fraction collapses to about 50%. That gives you 108 x 0.5 x 0.85 = 45.9Wh, divided by 630W, which is under 5 minutes. Same battery, same UPS, less than half the runtime. That is the entire story of UPS backup in one calculation.
Run the calculation across the whole load range and the Mercury UPS 1050 looks like this:
| Connected Load | Estimated Runtime | What That Load Looks Like |
|---|---|---|
| About 200W | 18 to 25 minutes | Laptop, monitor, router, and decoder |
| About 300W | 10 to 15 minutes | Standard desktop tower, monitor, and router |
| Full 630W | 4 to 6 minutes | Everything the unit is rated to carry at once |
You will sometimes see 15 to 25 minutes quoted for this unit. That figure describes a lighter 200W to 300W load, which is how most people actually use it, rather than a true 315W half load. Both numbers are honest, they just answer different questions.
If you would rather not do the arithmetic by hand, our battery runtime calculator handles both UPS and inverter batteries.
THE BIG ONLINE UNITS: 2KVA TO 30KVA
Once you cross into the online double conversion range, two different things happen depending on which family you buy, and that difference decides whether you get minutes or hours.
The MP PRO single phase towers come with their batteries included. The 3kVA carries 8 x 12V 7Ah on a 96Vdc bus. The 6kVA and 10kVA ship with 20 VRLA blocks as standard, with 16 or 18 also settable. You plug them in and they work out of the box, and Mercury publishes a figure for the 3kVA: 5 minutes at full load, 12 minutes at half load. That is the same order of magnitude as a desktop UPS, because the internal blocks are physically small. What you gain over a desktop unit is zero transfer time and a pure sine wave, not extra hours.
Envy battery architecture varies by model. The 2kVA Envy includes 4 x 12V 9Ah internally and can accept optional external modules. The larger Envy units and the three phase frames run on an external bank that you specify at the point of order: ±96 / ±108 / ±120Vdc on the Envy machines, 360V to 480Vdc on the three phase ones. Change the Ah rating of those blocks and you change the runtime by an order of magnitude without touching the UPS itself. This is where a UPS stops being a shutdown device and starts replacing a generator.
On the MP PRO single phase units the batteries are in the price, so the question to ask is what Ah those 20 blocks are, because that is what sets your runtime. On the larger Envy rack mounts and the three phase frames, the machine and the long-run battery bank are separate line items. A 10kVA Envy frame quoted bare and the same frame quoted with a 200Ah cabinet are separated by hours of backup and by millions of naira. Get the battery specification in writing either way. This is the single most common source of disappointment on large UPS orders.
Mercury online UPS range and August 2026 prices
| Mercury Online Model | Capacity | Phase | Battery String | Price | Typical Deployment |
|---|---|---|---|---|---|
| Mercury 2kVA Online Envy Rack Mount | 2000VA / 1800W | Single | 4 x 12V 9Ah internal, plus optional external modules | ₦550,000 currently out of stock, confirm availability |
Small comms rack, single server |
| Mercury 3kVA Online Single Phase | 3000VA / 2400W | Single | 8 x 12V 7Ah included, 96Vdc | ₦793,000 | Comms room, single server, clinic bench. Mercury publishes 5 min full load, 12 min half load. |
| Mercury Envy 6kVA Online Rack Mount | 6000VA / 5400W | Single | External bank, 16 / 18 / 20 batteries settable; ±96 / ±108 / ±120Vdc split bus, equivalent to 192 / 216 / 240Vdc total | ₦1,400,000 currently out of stock, confirm availability |
Rack or tower, growing office IT room |
| Mercury 6kVA Online Single Phase MP PRO | 6kVA / 4.8kW | Single | 20 x 12V VRLA included; 16 or 18 also settable | ₦1,820,000 | Clinic imaging, lab benches, comms room |
| Mercury Envy 10kVA Online Rack Mount | 10000VA / 9000W | Single or three | External bank, 16 / 18 / 20 batteries settable; ±96 / ±108 / ±120Vdc split bus, equivalent to 192 / 216 / 240Vdc total | ₦2,130,000 currently out of stock, confirm availability |
Full rack, branch data room |
| Mercury 10kVA Online Single Phase MP PRO | 10kVA / 8kW | Single | 20 x 12V VRLA included; 16 or 18 also settable | ₦2,470,000 | Bank branch, small data centre, theatre suite |
| Mercury 20kVA Online 3 Phase | 20kVA | Three | 360V to 480V DC bus | ₦7,650,000 currently out of stock, confirm availability |
Industrial plant, campus IT |
| Mercury 30kVA Online 3 Phase | 30kVA / 27kW at 0.9PF | Three | 360V to 480Vdc bank, N+X up to 6 units | ₦8,500,000 | Hospital wing, factory line, telecom site |
A 40kVA three phase unit sits above these at ₦9,971,000, and the EP series scales to 800kVA on request. At that end of the range nothing is bought off a price list anyway, so treat those as starting points for a site survey rather than shelf prices.
The same UPS, four different runtimes
This is the table that actually answers the question. Below is a 6kVA online frame at 4.8kW, running four different battery banks on a 20 block, 240V string. The top row is close to what a compact included string delivers. The rows below it are what becomes possible once you move to a proper external cabinet, which is an Envy or three phase conversation rather than an out-of-the-box MP PRO one. Note also that the Envy 6kVA is a different machine rated at 5.4kW, so its figures shift slightly. The numbers use the same formula from earlier, with VRLA capacity derated for discharge rate and 92% online inverter efficiency.
Illustrative runtime using a 20 x 9Ah battery configuration. Mercury confirms that 20 VRLA blocks are included with the 6kVA and 10kVA MP PRO units, but the Ah rating is not published and market specifications show both 8.2Ah and 9Ah in circulation. Confirm the Ah rating supplied with your specific unit before quoting a guaranteed runtime to a client.
| Battery Bank (20 x 12V) | Stored Energy | Runtime at 4.8kW | Runtime at 2.4kW | What It Is For |
|---|---|---|---|---|
| 20 x 9Ah | 2.2 kWh | 5 to 8 minutes | 10 to 15 minutes | Ride through the switchover to a generator |
| 20 x 18Ah | 4.3 kWh | 10 to 14 minutes | 35 to 45 minutes | Longer graceful shutdown, slow-starting gensets |
| 20 x 100Ah cabinet | 24 kWh | 2.5 to 3 hours | 6 to 7 hours | Run right through a normal Nigerian outage |
| 20 x 200Ah cabinet | 48 kWh | 6 to 7 hours | 13 to 15 hours | Full day of autonomy without starting a generator |
Scale the load and the pattern holds. The 10kVA at its full 8kW gives roughly 4 to 6 minutes on a 20 x 9Ah string, about 1.5 hours on 20 x 100Ah, and close to 4 hours on 20 x 200Ah. The 30kVA three phase on a 32 battery, 384Vdc bank gives roughly 25 to 30 minutes on 100Ah blocks and around 1.5 hours on 200Ah blocks at full output. Halve the load in each case and the runtime more than doubles, because a gentler discharge also recovers capacity the Peukert effect would otherwise eat.
Two 30kVA Mercury variants are in circulation. The current three phase unit is specified at an output power factor of up to 0.9, which puts it at 30kVA / 27kW, and the figures above are calculated on that basis. An older EP30K rated 30kVA / 24kW also trades in the Nigerian market and will run roughly 15% longer on the same bank. Quote the model code on your order so the battery bank is sized against the right number.
These are engineering estimates, not guarantees. Real runtime shifts with battery age, room temperature, block quality, and how balanced the string is. Treat them as sizing guidance and let us confirm against your actual load schedule before you commit to a bank.
So is a 10kVA online UPS a substitute for an inverter?
For a business, increasingly yes, but only if you specify it that way. Straight out of the box on its included blocks, a 6kVA or 10kVA MP PRO gives you minutes, not hours. Put a 100Ah or 200Ah external cabinet behind a 6kVA or 10kVA online frame and you have a machine that carries a clinic or a bank branch straight through an outage with zero transfer time and ₦0 petrol or diesel burned. Sensitive equipment never sees a flicker, which is the whole point of double conversion. The upgrade is the battery bank, not the UPS.
This requires a UPS model designed for long-run external batteries. The DC bus voltage, battery count, charger current, protective devices and expected recharge time must all be confirmed for the exact model before connecting a large battery cabinet. A very large bank behind an undersized charger can take an impractical length of time to recharge, which quietly defeats the purpose in an area with frequent outages. Talk to us before you buy the batteries.
What an online UPS does not normally provide is direct solar panel input. It recharges its battery bank from an AC source such as NEPA or a compatible generator. For anyone who wants solar panels charging the batteries during the day, or who is powering a home rather than critical equipment, a solar hybrid inverter system remains the cheaper and more flexible solution. The online UPS earns its price when a flicker costs you a scan, a transaction, or a production batch. See the online UPS explainer for how double conversion differs from line interactive switching.
WHAT ACTUALLY EATS YOUR MERCURY UPS RUNTIME
1. Connected load, the biggest variable by far
Plug a workstation pulling 500W into a Mercury UPS 1050 rated 630W and you get a few minutes. Plug in only a 15W internet router and that same UPS may run for an hour or longer, depending on inverter self-consumption, battery condition and the unit’s no-load shutdown setting. Nothing else on this list comes close to load in terms of impact, which is why buying one size above your real draw is the cheapest runtime you will ever buy. It is also why gaming rigs, which sit near the top of the wattage range, are better served by an inverter, as we set out in our guide to powering a gaming PC in Nigeria.
2. Battery age and heat
Sealed lead-acid batteries degrade whether you use them or not. A brand new Mercury UPS delivers its full rated backup, but after 2 to 3 years of daily cycling, especially in an unventilated Lagos office where ambient temperature sits above 30 degrees, capacity can fall by half. Heat is the silent killer here. As a general VRLA rule of thumb, sustained operation around 10 degrees above the rated 25C reference temperature can reduce expected service life by roughly half. When runtime falls sharply but the UPS otherwise operates normally, the battery may need replacing rather than the complete UPS. Contact Mercury Direct with your exact UPS model so we can confirm the correct battery capacity, quantity and current replacement price. Capacity and block count vary across the range: one block in a 650 or 1050, two in a 1550VA Maverick or Elite 2000VA Pro, four in an Elite 3000VA Pro.
3. State of charge when the light goes
A fully drained Mercury UPS needs 6 to 8 hours on mains power to recover to about 90% capacity. In areas where NEPA gives you three hours on and five hours off, your UPS may never see a full charge, so every outage starts from a partial tank. If your grid supply is that unstable, a UPS alone is not the answer.
4. Load creep
The setup you sized the UPS for in January is rarely the setup running on it in August. A second monitor here, a printer there, a phone charger somebody plugged in “just for a minute.” Audit the sockets on the back of your UPS every few months. Printers and laser devices in particular should never share a UPS with a PC, since their warm-up surge can trip the whole unit.
UPS VERSUS GENERATOR VERSUS INVERTER: THE HONEST COST PICTURE
As of early August 2026, market reports put NNPC petrol in Lagos around ₦1,265 per litre, after a ₦35 reduction from the previous rate. Fuel prices now move quickly, so the exact pump price may differ by location and week, but the direction is clear: every extra hour on generator is becoming more expensive.
Here is what six hours of daily backup actually costs across the three options:
| Option | Upfront Cost | Runtime per Outage | Monthly Running Cost | Verdict |
|---|---|---|---|---|
| Mercury UPS 1050 | ₦63,000 | 10 to 25 minutes depending on the connected load | Under ₦1,000 in charging | The cheapest way to never lose work. Pair it with an inverter for the long outages. |
| Small petrol generator (0.8L per hour) | ₦180,000 to ₦250,000 | Unlimited while fuel lasts | About ₦182,000 in petrol, plus oil, plugs and servicing | Runs forever, drains your wallet just as long. |
| Mercury 2.4kVA Complete Inverter System | ₦1,146,000 | 6 to 8 hours on a typical essentials load | About ₦20,000 to ₦23,000 in Band A charging | ₦0 petrol. Pays back the generator gap in about seven months. |
The inverter still needs to be charged from NEPA, solar, or another energy source, so it is not free power. What it removes is the daily petrol burn that makes generator backup so punishing.
How the charging figure is worked out: a 400W essentials load for six hours a day is 72kWh of usable power a month. Allowing for inverter conversion and battery round trip losses, roughly 100kWh has to come off the grid to replace it. Band A tariffs run between ₦206 and ₦225 per kWh depending on your DisCo and feeder classification, which lands the monthly charging bill between about ₦20,000 and ₦23,000. Heavier daily use, or cycling the bank close to empty every day, pushes it higher. The generator column assumes 0.8 litres per hour over the same six hours at ₦1,265 per litre.
NEED HOURS INSTEAD OF MINUTES? BUY AN INVERTER, NOT A BIGGER UPS
This is the part most people skip, and it is the part that saves them money. Going up a UPS size buys you more watts, not more hours. The Mercury Elite 3000VA Pro is a capable machine at what it is designed for, holding an office server cabinet through a switchover, and at ₦325,000 it delivers about six minutes at full load because the internal batteries stay compact by design. If what you actually want is four hours of light and fans, that money works far harder in a different shape.
An inverter system flips the ratio. The electronics are modest, the batteries are enormous, and they are built for deep discharging every single day. Here is the same runtime formula applied to a proper battery bank:
Two 12V 200Ah batteries wired in series give you 24V at 200Ah, not 24V at 400Ah. Series doubles the voltage and leaves amp-hours alone. Parallel doubles the amp-hours and leaves voltage alone. Getting this backwards is how people end up buying half the battery bank they actually needed.
Two Mercury systems cover most homes and small offices:
- Mercury 1.5kVA Hybrid Solar Inverter MPPT at ₦259,000. The inverter head only, for anyone who already owns batteries. Good for lights, fans, TV, router, and laptops.
- Mercury 2.4kVA Complete Inverter System at ₦1,146,000. Inverter plus two 200Ah deep cycle batteries plus free installation. This is the essentials package: lights, fans, TV, decoder, Wi-Fi, laptops, and a fridge on a sensible duty cycle.
For a full walkthrough of battery counts against target backup hours, see our guide on how many batteries you need for 5 hours of backup, and which battery type is best for an inverter if you are weighing GEL against tubular and lithium.
HOW TO SQUEEZE MORE MINUTES OUT OF YOUR MERCURY UPS
- Unplug the passengers. Printers, scanners, desk fans, and phone chargers do not belong on a UPS. Move them to a surge strip and give the whole battery to your PC.
- Give it air. Do not box the unit inside a cabinet or push it flush against a wall. Heat is what kills the battery, and a cooler battery holds more charge for longer.
- Let it charge fully. After any deep discharge, leave it on mains for 6 to 8 hours before you rely on it again.
- Test the switchover monthly, not the whole battery. Disconnect mains power for one or two minutes under a controlled, non-critical load to confirm the UPS transfers correctly. Do not completely drain the battery every month. Run a full runtime test only when you need one, preferably no more than once every six months, and let the battery recharge fully afterwards.
- Replace the battery, not the UPS. The UPS electronics will often outlast the original battery. When runtime falls sharply but the unit otherwise operates normally, replacing the battery may be more economical than replacing the complete UPS. Our guide on extending inverter battery lifespan applies just as well to UPS cells.
- Size for the future. If you are buying now, read the office UPS sizing guide and buy one class above what you need today.
HOW LONG DOES A MERCURY UPS LAST: FREQUENTLY ASKED QUESTIONS
How long does a Mercury UPS last on a full charge?
Between 5 and 10 minutes at a true 100% load, and roughly 10 to 25 minutes at half load, depending on the model. The Mercury UPS 1050 carrying a 300W desktop gives about 12 to 15 minutes, while the same unit at its full 630W rating gives under 5 minutes. Changeover happens within milliseconds, so a properly sized UPS will normally keep connected equipment running without interruption. For hours of backup, add an inverter system alongside it.
Why does my Mercury UPS only last 5 minutes?
Most likely you are running close to its full rated wattage, or the internal battery has aged. A UPS battery is a small 8.2Ah or 9Ah sealed cell, and small cells lose a large share of their rated capacity when drained hard. If the unit used to hold fifteen minutes and now holds four, the battery needs replacing rather than the whole UPS.
Can a Mercury UPS run my fridge or freezer?
The small 650VA to 3000VA desktop UPS models are not recommended for fridges or freezers. Compressor startup current and extended running time make an inverter system the more practical solution. A properly sized large online UPS can power refrigeration equipment, but it must be engineered against both the running load and the compressor startup surge.
How long does a Mercury UPS take to recharge?
About 6 to 8 hours on mains power to return to roughly 90% capacity after a complete discharge. If your area gets frequent short outages, the UPS may never reach a full charge between them, which shortens the runtime you actually see.
How many years does a Mercury UPS battery last in Nigeria?
Typically 2 to 3 years with daily cycling. Heat is the main factor. An unventilated office running above 30 degrees will wear the battery out faster than a cool, well-aired room. Replacing the battery is normally far cheaper than replacing the whole UPS, since the electronics usually outlast the original cells. Cost depends on the battery capacity and how many blocks sit inside your unit, which ranges from one in a 650 to four in an Elite 3000VA Pro. Contact Mercury Direct with your exact model and we will confirm the correct capacity, quantity and current price.
Should I buy a bigger UPS or an inverter for long backup?
For ordinary home or office backup measured in hours, choose an inverter system. A larger desktop UPS increases the wattage it can carry but not the hours it can carry it for, because the internal batteries stay compact by design. The Mercury Elite 3000VA Pro at ₦325,000 is excellent at protecting a server cabinet through a switchover, and delivers about six minutes at full load. For servers, medical equipment, banking systems and other critical loads requiring zero transfer time, a properly configured online UPS with an external battery bank may be the correct solution instead.
How long does a Mercury 3kVA, 6kVA or 10kVA online UPS last?
The MP PRO single phase units come with their batteries included, so out of the box they give you minutes rather than hours. Mercury publishes 5 minutes at full load and 12 minutes at half load for the 3kVA, which carries 8 x 12V 7Ah on a 96Vdc bus. The 6kVA and 10kVA ship with 20 VRLA blocks as standard and land in a similar band, roughly 5 to 8 minutes and 4 to 6 minutes respectively at full output. Where the exact model supports a long-run external battery bank, a larger cabinet can extend runtime from minutes into hours: a 20 x 100Ah bank behind a 6kVA frame gives about 2.5 to 3 hours at full load, and 20 x 200Ah gives 6 to 7 hours. Confirm the DC bus voltage, battery count, charger current and recharge time for your exact model first. The upgrade is the battery bank, not the UPS.
How long does a Mercury 30kVA online UPS last?
The 30kVA three phase unit runs a 360V to 480Vdc battery bank, which is roughly 30 to 40 12V blocks. On the current 0.9 power factor specification the unit is rated 30kVA / 27kW, and at that full output you can expect around 25 to 30 minutes on 100Ah blocks and roughly 1.5 hours on 200Ah blocks. At half load those figures more than double. Note that an older EP30K rated 30kVA / 24kW is also in circulation and runs about 15% longer on the same bank, so confirm your model code. Because the bank is specified per site, the only reliable number comes from sizing against your actual load schedule.
Can a large online UPS replace an inverter for a business?
For many businesses, yes, though not on the batteries it ships with. A Mercury 6kVA or 10kVA online UPS paired with a correctly sized external battery bank can carry critical equipment through an outage with zero transfer time and no petrol or diesel burned by the UPS itself. The limitation is that an online UPS does not normally accept direct solar panel input. It recharges from an AC source such as NEPA or a compatible generator. If you want solar panels charging the batteries directly, a solar hybrid inverter system is generally the more flexible solution.
Is a UPS cheaper to run than a generator?
Yes, but they solve different problems. The Mercury UPS 1050 in this comparison costs under ₦1,000 a month in charging and buys you minutes of protection. A small petrol generator burning 0.8 litres an hour for six hours a day costs roughly ₦182,000 a month at August 2026 Lagos pump prices and runs indefinitely. An inverter system sits between them: ₦0 petrol or diesel, several hours of backup, and a charging bill of about ₦20,000 to ₦23,000 a month on Band A for a 400W essentials load run six hours a day. The inverter still draws from NEPA or solar to recharge, so it is not free power, but it removes the daily fuel burn.
STOP COUNTING MINUTES. START COUNTING HOURS.
Tell us what you are trying to keep running and we will size it properly, whether that means a ₦42,000 UPS for safe shutdown or a complete inverter system for real backup. Get free sizing advice, Lagos delivery and nationwide shipping. Lagos customers can pay on delivery, while free installation applies to qualifying complete inverter systems.
Call 07037451701 or message us on WhatsApp.